Sorry - this product is no longer available

Maturity Level Assurance for New Parts

€50.00
Prices excl. VAT and shipping 
Product creation - Maturity Level Assurance for new Parts - Methods, measurement criteria, documentation - 2nd revised edition, Oct. 2009 English version published in July 2010

Short description to VDA Volume “Maturity Level Assurance for new Parts”

 

This present volume is a revision of the first issue, dated November 2006. The revision was carried out as the result of feedback regarding the potential for standardisation, generated from pilot projects and training carried out between suppliers and OEMs.

The most significant changes and adaptations which have been made are:

  • The introduction of an additional maturity level (ML5): "Parts from production tools and production facilities are available" (resulting in levels of ML0 to ML7)
  • Revision of measurement criteria, including maturity level indicators (ML0-7) and synchronisation with VDA 6.3 (new)
  • Directing the measurement criteria toward the validation of product and process
  • Set of measurement criteria are now a valid standard, replacing OEM-specific maturity level methods, and apply to all new parts
  • Differentiated use of maturity level assurances for parts classified as A, B and C (prioritized) risks.

This publication is a guideline for companies in the automotive industry in implementing maturity level methodology in the validation of the products they receive from their suppliers. It may also be regarded as a requirement in a customer-supplier relationship (included, for example, in purchasing conditions, requirements specifications and project-specific requirements).

 

Contents

1

Preface

2

Objective, purpose and scope of the study

2. 1

Objective and purpose

2.2

Scope of the study

2.2.1

Risk classification (prioritizing)

2.2.2

Applying maturity level assurance depending on risk classification

2.3

Applying maturity level assurance in the supply chain

3

Contents of maturity levels

3. 1

Phases

3.2

Pre-Requisite

3.3

Start

3.4

Control

3.4.1

Preparation

3.4.2

Assessment

3.4.3

Carrying out maturity level assurance depending on the risk classification (prioritization)

3.4.4

Implementation

3.5

Status report covering maturity level, corrective actions and escalation

3.5.1

Maturity level status report

3.5.2

Escalation

4

Communication in the supply chain

4.1

Forms of communication

4.1.1

Exchange of information at "Round Table" meetings ("A" risk-classified (prioritized) parts)

4.1.1.1

Responsibilities

4.1.2

Exchange of information via "supplier self-assessment"

4.1.2.1

The supplier presents his assessment and actions to the customer ("B" risk-classified (prioritized) parts)

4.1.2.2

Information provided by the supplier via electronic data processing ("C" risk-classified (prioritized) part)

5

Standards in the process

5.1

Risk assessment and classification (recommendation)

5.2

Set of measurement criteria for maturity level assessments

I.

ML0 - Innovation release for full production development

II.

ML 1 - Requirements management for the contract to be issued

III.

ML2 - Specifying the supply chain and placing the order

IV.

ML3 - Release of technical specifications

V.

ML4 - Completion of production planning

VI.

ML5 - Parts from production too/s and production facilities are available

VII.

ML6 - Process and product approval

VIII.

ML7 - Project completion; transfer of responsibilities to Production/ Start requalification

Customers who bought this item also bought

Volume 02 - PPA_04/2020

Volume 2, Securing the Quality of Supplies Production process and product approval (PPA)
6th, revised edition, April 2020
€45.00 Prices excl. VAT and shipping 

Volume 06 Part 5_03/2020

Volume 6 Part 5 - Product Audit, 3rd, revised edition, March 2020
€35.00 Prices excl. VAT and shipping 

Field Failure Analysis & Audit Standard

Field Failure Analysis & Audit Standard
2nd revised edition, November 2018
€50.00 Prices excl. VAT and shipping